Detailed design, detailed ESIA, RAP preparation, construction tender documents and construction supervision option for the ACCES Project
CLIENT
Millennium Challenge Account Senegal II (MCA Senegal II)
COUNTRY
Senegal
FUNDING
Millennium Challenge Corporation (MCC)- Millennium Challenge Account MCA-Senegal
CONTRACTUAL SCHEDULE
2022 - 2026
PROJECT DESCRIPTION
The ACCES project comprises three activities:
I- Supply component, relating to the extension of the national power grid through the construction of 660 km of MV distribution lines and 420 km of LV lines for the electrification of around 325 localities in the Fatick, Kaolack, Tambacounda, Kolda and Sédhiou regions.
II- Consumer demand support component, with the aim of sustaining and increasing demand for electricity through demand-side interventions.
III- Distribution network improvement component, aimed at reducing technical losses as well as the frequency and duration of power cuts on the MV network
SCOPE OF SERVICES
-
Project Technical design taking into account environmental and social constraints
-
Preparation of the Project Stakeholder Engagement Plan
-
Elaboration of Initial Environmental Analyses by Region and the overall Environmental and Social Impact Assessment (ESIA) of the project
-
Elaboration of Resettlement Action Plans (RAP) by Department and by Component
-
Work control, including supervision of the implementation of Environmental, Social, Health and Safety provisions
-
Assistance of MCA-Senegal II for the implementation of the Resettlement Action Plan (RAP)
ROLE
Consortium member
PROVIDED TASKS
- Environmental and Social Impact Assessment (ESIA)
- Resettlement Action Plan (RAP)