Detailed design, detailed ESIA, RAP preparation, construction tender documents and construction supervision option for the ACCES Project

CLIENT

Millennium Challenge Account Senegal II (MCA Senegal II)

COUNTRY

drapeau_senegal
Senegal

FUNDING

Millennium Challenge Corporation (MCC)- Millennium Challenge Account MCA-Senegal

CONTRACTUAL SCHEDULE

2022 - 2026

PROJECT DESCRIPTION

The ACCES project comprises three activities:

I- Supply component, relating to the extension of the national power grid through the construction of 660 km of MV distribution lines and 420 km of LV lines for the electrification of around 325 localities in the Fatick, Kaolack, Tambacounda, Kolda and Sédhiou regions.

II- Consumer demand support component, with the aim of sustaining and increasing demand for electricity through demand-side interventions.

III- Distribution network improvement component, aimed at reducing technical losses as well as the frequency and duration of power cuts on the MV network

SCOPE OF SERVICES

  • Project Technical design taking into account environmental and social constraints
  • Preparation of the Project Stakeholder Engagement Plan
  • Elaboration of Initial Environmental Analyses by Region and the overall Environmental and Social Impact Assessment (ESIA) of the project
  • Elaboration of Resettlement Action Plans (RAP) by Department and by Component
  • Work control, including supervision of the implementation of Environmental, Social, Health and Safety provisions
  • Assistance of MCA-Senegal II for the implementation of the Resettlement Action Plan (RAP)

ROLE

Consortium member

PROVIDED TASKS

  • Environmental and Social Impact Assessment (ESIA)
  • Resettlement Action Plan (RAP)

FIELDS OF ACTIVITY

Energy

  • Conventional Energy

Sustainable Development (SD) & Climate Change (CC)

  • Development of Sensitive/Forested Areas

Expertise and innovation for a sustainable future

Contact us today to benefit from our expertise at the service of inclusive, resilient and sustainable development.