Environmental and social impact study (ESIS) of the 120 MW Nkok solar power plant
CLIENT
SOLEN
COUNTRY
Gabon
FUNDING
Private - SOLEN
CONTRACTUAL SCHEDULE
2022 - 2022
PROJECT DESCRIPTION
The project comprises two components: (i) construction of a solar power plant with a capacity of 120 MW over an area of 251 ha, and (ii) installation of a 10 km long 90 KV power line linking the plant to the 225/90 kV Ntoum 2 transformer substation in Libreville province.
SCOPE OF SERVICES
- Phase 1 : Preparation of the ESIA Terms of Reference
- Phase 2 : Preparation of the Stakeholder Engagement Plan
- Phase 3 : Preparation of the ESIA
- Phase 4 : Preparation of the Resettlement Action Plan (RAP)
ROLE
Individual Contractor
PROVIDED TASKS
- Environmental and Social Impact Assessment (ESIA)
- Resettlement Action Plan (RAP)
FIELDS OF ACTIVITY
Energy
- Non conventional Energy
Sustainable Development (SD) & Climate Change (CC)
- Development of Sensitive/Forested Areas