Technical and economic studies for the implementation of a pilot corridor of “Bus Rapid Transit-BRT” in the city of Douala

CLIENT

Ministry of Housing and Urban Development

COUNTRY

drapeau_cameroun
Cameroon

Cameroon

FUNDING

International Development Association (IDA) - World Bank

CONTRACTUAL SCHEDULE

2021 - 2021

PROJECT DESCRIPTION

The World Bank has initiated the preparation of a project to improve urban mobility and support inclusive economic development along the Bus Rapid Transit (BRT) lanes and the corresponding feeder lines. The project to set up a pilot “BUS RAPID TRANSIT” corridor in the city of Douala fits into this context.
It mainly involves a facade-to-facade treatment of 28.8 km of urban roads, including specific developments, bus feeder lines and other modes of transport, the installation of ticketing equipment, an Intelligent Transport System (ITS) as well as vertical and traffic light signalling and public lighting equipment.

SCOPE OF SERVICES

  • Organization and mission start-up
  • Data collection and fieldwork
  • Socio-economic study
  • Environmental impact study
  • Preliminary design studies
  • Detailed design studies and tender documents

ROLE

Consortium member

PROVIDED TASKS

  • Economic and Financial Studies and Public-Private Partnership (PPP)
  • Traffic Studies and Modeling

FIELDS OF ACTIVITY

Mobility, Transport and Logistics

  • E-Mobility & Intelligent Mobility
  • Urban Mobility
  • Road Transport

Towns & Land Planning

  • Urban Development

Expertise and innovation for a sustainable future

Contact us today to benefit from our expertise at the service of inclusive, resilient and sustainable development.